Gill Nagar

  • Ground Floor Plan
  • First Floor Plan
  • Second floor Plan
  • Area Statement
  • Specifications
  • Payment Schedule

Ground Floor Plan

First Floor Plan

Second Floor Plan

Area Statement

FLOOR
UNIT
AREA
First Floor
F1
1309
First Floor
F2
946
First Floor
F3
1301
Second Floor
S1
1309
Second Floor
S2
946
Second Floor
S3
1301

SPECIFICATIONS

Super Structure
R.C.C. 1:2:4, steel 8.10.12, 16 mm dia., TMT of Tulsyian or I-STEEL.
Structure
R.C.C. Framed Structure with brock masonry walls.
Flooring and Tiles
For floor 2' X 2' vitrified tiles.
Toilets and Kitchen Dadoings
All toilets shall have 7'0" height dadoing.
Loft and Attic
All bedrooms will have ONE loft each kitchen will have "L" shaped loft.
Main door & Windows
  Teak wood frame 3" X 5", planned shutter with 1.5 rails.
  Teak wood (2nd class) windows frame.

Painting
Inside walls, ceiling shall be painted with ACE (Asian Paint), Outside walls shall be painted with cement based paint (apex or matt).
Kitchen
Kitchen working platform shall have polished granite with polished edges.
Electrical And Cable Work
  Necessary electrical points using good quality wires (Kunden/Finolex).
   M.C.B. (L & T) will be provided.

Sanitary and Water Supply
Good quality C.P. Fittings & Parryware Branded Items.
Defect Liability Period
The defect liability period will be one year (one winter and one summer) from the date of handing over the building.

Payment Schedule

NO
PAYMENT SCHEDULE
PERCENTAGE OF AMOUNT
1
At the time of signing this agreement.
10 %
2
At the time of registration.
40 %
3
At the time of completion of the basement.
15 %
4
At the time of completion of the roofing.
15 %
5
At the time of completion of inner wall partition.
10 %
6
On completion of fixing of tiles, inner painting, inner electricals, inner plumbing, fixing of frames and doors.


5 %
7
At the time of handing over.
5 %