Swamimalai Nagar, Zamin Pallavaram

  • Stilt Floor Plan
  • First Floor Plan
  • Second floor Plan
  • Area Statement
  • Specifications
  • Payment Schedule

Stilt Floor Plan

First Floor Plan

Second Floor Plan

Area Statement

PHASE I - PLOT A

FLOOR
UNIT
AREA
First Floor
F1
909
First Floor
F2
844
First Floor
F3
1010
Second Floor
S1
909
Second Floor
S2
844
Second Floor
S3
1010
PHASE I - PLOT B

FLOOR
UNIT
AREA
First Floor
F1
750
First Floor
F2
748
Second Floor
S1
750
Second Floor
S2
748
PHASE I - PLOT C

FLOOR
UNIT
AREA
First Floor
F1
812
Second Floor
S1
1124
PHASE I - PLOT E

FLOOR
UNIT
AREA
First Floor
F1
1020
First Floor
F2
664
Second Floor
S1
1020
Second Floor
S2
664
PHASE II - PLOT D

FLOOR
UNIT
AREA
First Floor
F1
833
First Floor
F2
542
First Floor
F3
1045
Second Floor
S1
833
Second Floor
S2
542
Second Floor
S3
1045
PHASE II - PLOT F

FLOOR
UNIT
AREA
Ground Floor
G1
1080
First Floor
F1
1288
PHASE II - PLOT G

FLOOR
UNIT
AREA
First Floor
F1
954
First Floor
F2
1030
First Floor
F3
1291
Second Floor
S1
954
Second Floor
S2
1030
Second Floor
S3
1291
PHASE II - PLOT H

FLOOR
UNIT
AREA
First Floor
F1
1139
First Floor
F2
585
First Floor
F3
852
Second Floor
S1
1139
Second Floor
S2
585
Second Floor
S3
852

SPECIFICATIONS

Super Structure
R.C.C. 1:2:4, steel 8.10.12, 16 mm dia., TMT of Tulsyian or I-STEEL.
Structure
R.C.C. Framed Structure with brock masonry walls.
Flooring and Tiles
For floor 2' X 2' vitrified tiles.
Toilets and Kitchen Dadoings
All toilets shall have 7'0" height dadoing.
Loft and Attic
All bedrooms will have ONE loft each kitchen will have "L" shaped loft.
Main door & Windows
  Teak wood frame 3" X 5", planned shutter with 1.5 rails.
  Teak wood (2nd class) windows frame.

Painting
Inside walls, ceiling shall be painted with ACE (Asian Paint), Outside walls shall be painted with cement based paint (apex or matt).
Kitchen
Kitchen working platform shall have polished granite with polished edges.
Electrical And Cable Work
  Necessary electrical points using good quality wires (Kunden/Finolex).
   M.C.B. (L & T) will be provided.

Sanitary and Water Supply
Good quality C.P. Fittings & Parryware Branded Items.
Defect Liability Period
The defect liability period will be one year (one winter and one summer) from the date of handing over the building.

Payment Schedule

NO
PAYMENT SCHEDULE
PERCENTAGE OF AMOUNT
1
At the time of signing this agreement.
10 %
2
At the time of registration.
40 %
3
At the time of completion of the basement.
15 %
4
At the time of completion of the roofing.
15 %
5
At the time of completion of inner wall partition.
10 %
6
On completion of fixing of tiles, inner painting, inner electricals, inner plumbing, fixing of frames and doors.


5 %
7
At the time of handing over.
5 %